LG Multi V Installation Essentials

Summary

Join our LG Installation Essentials training class and learn the manufacturer’s guidelines for installing the piping and wiring systems connected to the indoor and outdoor LG VRF air conditioning equipment.

Registration

Register for Sacramento Training
Register for Bay Area Training
Register for Reno Training
Download Sac Flyer

Download Bay Area Flyer

Download Reno Flyer

Details

October 24, Tuesday | 8am – 3pm
Sacramento Office
10210 Systems Pkwy #370, Sacramento, CA 95827
Contact Alyssa Hernandez (916) 368-7476 | alyssa.hernandez@dmgn.com

October 25, Wednesday | 8am – 3pm
Bay Area Office
4795 Heyer Avenue, Castro Valley, CA 94546
Contact Claudia Torres (510) 346-7755 | claudia@dmgn.com

October 25, Wednesday | 8am – 3pm
Reno Office
910 Greg Street, Sparks, NV 89431
Contact Jody Eddy (775) 284-1240 | jody.eddy@dmgn.com

View Full Training Schedule

View Office Location

Class Details

Prerequisites:
1) Advanced technical knowledge of commercial a/c, heat pump, and applied systems.
2) Basic working knowledge of Microsoft Office programs including Excel, Power Point and Word.

What you will learn:

The manufacturer’s guidelines for installing the piping and wiring systems connected to the indoor and outdoor LG VRF air conditioning equipment.

This class begins with a brief introduction to LG Electronics followed by lectures about product installation consideration and a discussion covering pre-commissioning tasks that must be completed before arranging for factory authorized startup and commissioning. During lab activities students will be introduced to LGMV (LG Monitoring View Software) which is the tool that must be used to evaluate equipment performance. Emphasis is also placed on piping and control wiring.

Who should attend?

Anyone who will be engaging in field installation of LG VRF equipment.